Skip to content
Canalstone Construction Group LLC
21194 State Route 22 from above: a long gray-sided building with green and silver metal roofs and a two-story center section, a freshly paved lot in front, and open farm fields and wooded hills behind
All Projects
CompletedFounder-Led Experience

Property Rehabilitation & Improvement

21194 State Route 22

Upstate New York

Location
Upstate New York
Category
Property Rehabilitation & Improvement
Current Status
Completed
Canalstone’s Role
Founder-Led Experience

Project Overview

Overview

The 21194 State Route 22 project involved the rehabilitation and improvement of an existing property through a coordinated construction effort.

The project focused on improving the property’s condition, functionality, and long-term usability through building improvements and renovation work.

This completed project represents construction and property redevelopment experience associated with Canalstone’s founder.

Canalstone’s Involvement · Founder-Led Experience

This project was completed in 2023 under the leadership of Canalstone’s founder, before Canalstone Construction Group LLC was formed in November 2026. It is presented as the founder’s construction and property redevelopment experience.

At a Glance

Project Details

Construction Start
March 2023
Completion
November 2023
Duration
Approximately 8 months

The Work

Scope of Work

  • Property evaluation and construction planning
  • Selective demolition and preparation
  • Interior rehabilitation and improvements
  • Installation of new interior finishes
  • Construction coordination and material procurement
  • Final finishes, cleanup, and project closeout

Milestones

Construction Timeline

  1. March 2023

    Construction Begins (Complete)

    Initial property assessment, site preparation, and renovation commencement.

  2. Spring–Summer 2023

    Rehabilitation (Complete)

    Primary construction and property improvement activities.

  3. Fall 2023

    Final Improvements (Complete)

    Completion of remaining construction work and finishes.

  4. November 2023

    Project Completed (Complete)

    Construction and property improvements completed.

Transformation

Before & After

Renovated bedroom with gray walls, wood floors, a wall-mounted heat pump and a white six-panel door open to the kitchen
Room before renovation, with stained carpet, scattered debris and torn window coverings
BeforeAfter
Renovated apartment hallway with wood floors, gray walls and white doors opening into two rooms
Room before renovation, seen through a doorway, with trash, boxes and cables strewn across the floor
BeforeAfter
Renovated kitchen with white shaker cabinets, stainless steel refrigerator and dishwasher, a marble-look backsplash and wood floors
Kitchen before renovation, with dated wood cabinets, a cluttered counter and debris piled on the floor
BeforeAfter
Renovated bathroom seen through a doorway, with a wood vanity, framed mirror, new light fixture and toilet
Gutted interior before renovation, with the ceiling opened up, exposed framing and insulation piled on the floor
BeforeAfter

Start a Conversation

Let’s Build Something Lasting.

Planning a commercial renovation, historic restoration, or redevelopment project? Let’s discuss how Canalstone can help bring your vision to life.